DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 113
Silicone Keyboard Cover Installation
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) Connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
4.) Select comments and type different A/N keys to confirm keyboard functionality.
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
Table 8-129 A/N Keyboard Mechanics Installation
Steps Corresponding Graphic
1. Install the new Cover onto the
Keyboard Mechanics.
Make sure the Cover is completely
around the Keyboard Mechanics,
so the Mechanics and Cover are
installed correctly.
2. Re-install the Keyboard.Cover onto the Keyboard Mechanics.
Make sure the Cover is completely around the Mechanics, so the Mechanics and Cover are
installed correctly.
Re-connect the Signal Cable if it was disconnected.
Place any excess Cable into the Lower Frame when re-installing the Keyboard.
3. Re- install Keyboard and Cover.
Table 8-130 Silicone Keyboard Cover replacement Functional Checks
See:
Section
Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Equipment passed all
required checks and is ready for use.
4-2-7 B-Mode Checks
4-2-4 Power SHUT DOWN