GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-8 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-2-2 Removal procedure (cont’d)
9.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-2-3 Mounting Procedure
Install the each of the new part in the reverse order of removal procedure.
Table 8-3 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-2. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-2
LCD plastic filter Function Validation
Procedure
Section 10-5-5
Physical Inspection