GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-57
8-2-18-3 Removal procedure (cont’d)
5.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-18-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Table 8-19 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-18. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-1
Cover Parts Function Validation
Section 10-5-5
Physical Inspection