GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-90 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-36-3 Removal procedure (cont’d)
5.) Remove the battery.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-36-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-124 Pull out the battery from SYSCON PWA
Table 8-37 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-36. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-9-4
SYSCONML Assy Function Validation
Procedure
Section 4-3-4
System B/M-Mode Checks
Section 4-3-5
System CFM and PWD Checks
Section 4-5
Peripheral Checks
Section 10-5-2
Functional Checks (See Also Chapter 4)
Section 10-5-2-2
Peripheral/Option Checks
Section 10-5-5
Physical Inspection