EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ P5 Basic OB

GE LOGIQ P5 Basic OB User Manual

GE LOGIQ P5 Basic OB
532 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #71 background imageLoading...
Page #71 background image
GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 3-5 - Completing the Installation 3-11
Section 3-5Completing the Installation
3-5-1 Power On/Boot Up
NOTE: After turning off the system, wait at least ten seconds before turning it on again. The system
may not be able to boot if power is recycled too quickly.
3-5-1-1 Scanner Power On
1.) Connect the Main Power Cable at the rear of the System.
2.) Connect the Main Power cable to an appropriate mains power outlet.
3.) Switch ON the Main Circuit Breaker at the rear of the System.
When power is applied to the Scanner, and the Rear Circuit breaker is turned ON, Power is distributed
to the DC Power supply unit and power control assy in the AC power assy. When the Power ON/OFF
key is pressed once, the DC power supply is enabled and feed each DC power to board assemblies.
and system run the software.
4.) Press the
ON/OFF key at the front of the System once.
WARNINGWARNING
Protective earth must be taken when connecting AC power cable (200V) without its plug
to wall outlet.
Figure 3-8 Circuit Breaker

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P5 Basic OB and is the answer not in the manual?

GE LOGIQ P5 Basic OB Specifications

General IconGeneral
BrandGE
ModelLOGIQ P5 Basic OB
CategoryMedical Equipment
LanguageEnglish

Related product manuals