Replacement Procedures
8-66 Vivid E80/E90/E95 – Service Manual
GC091052
Rev. 3
7. Remove the Rotary buttons below the Touch screen and the
Volume button.
8. Remove the Operating Panel, Upper.
9. Remove the Operating Panel, Lower. Place it on a clean
surface with the front down.
10. Remove the Operating Panel, Upper.
11. Remove the Operating Panel, Lower.
12. Remove the Bulkhead Board.
13. Remove the Bulkhead Plate.
14. Remove the Upper Frame Assembly.
15. Remove the Lower Frame Assembly.
16. Remove the XY (Frogleg) Assembly.
17. Remove the XYZ Control Box.
Remove the Z-Mechanism
The Z-Mechanism is fastened with several screws.
Follow this procedure to remove the Z-Mechanism:
1. Remove four (4x) screws from the lower part of the
Z-Mechanism.
2. Remove four (4x) screws.
3. Lift the Z-Mechanism away.
Install the Z-Mechanism:
Follow this procedure to install the Z-Mechanism:
1. Position the Z-Mechanism so the holes for the fixing screws
align.
2. Install two (2x) M6x16 Countersunk and two (2x) M6x16
screws.
3. Install four (4x) M6x16 (lower part of unit).
4. Install the XY (Frogleg) Mechanism.
5. Install the Lower Frame Assembly.
6. Install the Upper Frame Assembly.
7. Install the Bulkhead Plate.
8. Install the Bulkhead Board.
9. Install the Operating Panel, Lower.
10. Install the Operating Panel, Upper.
11. Install the LCD Arm assembly.
12. Install the LCD Monitor assembly.