Front End Processor (FEP) / Card Cage parts replacement
Vivid E80/E90/E95 – Service Manual 8-95
GC091052 Rev. 3
cSound Power Module (CPM) replacement
Preparations
When preparing for the replacement, you must perform the
following steps:
1. Power down the Ultrasound system.
2. Disconnect the Mains Power Cable from the wall outlet.
3. Disconnect all probes and external I/O cabling.
4. Remove the Right Side Cover.
5. Remove the FEP Cover.
Remove the cSound Power Module
Carefully unplug the cSound Power Module.
Install the cSound Power Module
Plug in the cSound Power Module.