EasyManuals Logo
Home>GSi>Farm Equipment>Sweep II Series

GSi Sweep II Series User Manual

GSi Sweep II Series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
4. General Product Information
18 PNEG-750-G2 16" Series II Sweep 131' and 135' Diameter
Capacities and Specifications
A. Use the Chart below to determine the horsepower required.
NOTE: Sweep is not designed to start under full load.
NOTE: The horsepower recommendations are for augering reasonably dry grain. High moisture grain
(greater than 15%) will require greater power for maximum capacity.
NOTE: Sweep drive and carrier wheels require plates or track over aeration flooring for travel and
supports not supplied with the sweep unit. Contact the installer or flooring provider for possible
sources and details.
B. A magnetic starter should be used to protect the motor when starting and stopping. It should stop
the motor in case of power interruption, conductor fault, low voltage, circuit interruption or motor
overload. The motor must be restarted manually. Some motors have built-in thermal overload
protection. If this is the type of motor being used, use only those with a manual reset.
C. The motor starting controls must be located outside the bin. They must NEVER be installed on the
Series II auger inside the bin.
D. Disconnect and lock out the power before resetting motor overloads.
E. Disconnect and lock out the power before entering the bin.
F. Disconnect and lock out the power before servicing the equipment.
G. Position the reset and motor starting controls so that the operators have full view of the equipment.
H. Make sure electric motors are grounded.
16" Series II Sweep
Bin
Diameter
Drive HP
Bushel/MT per Hour Horsepower
Length Pivot to End
8000/205 9000/230 10000/255
131' 5 N/A 25 25 63.90' (19.48 m)
135' 5 N/A 25 25 65.90' (20.09 m)
Electrical controls and wiring should be installed by a qualified electrician. The
motor disconnect switches and conductor cables should comply with the National
Electrical Code and any local codes. Locate reset and motor starting stations so
the operator can see that all personnel are clear of the equipment.
There should ALWAYS be two (2) people in the work area.
A main power disconnect switch capable of being locked only in the OFF position
should be used. It should be locked in the OFF position whenever work is being
done on the Series II Sweep.

Table of Contents

Other manuals for GSi Sweep II Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GSi Sweep II Series and is the answer not in the manual?

GSi Sweep II Series Specifications

General IconGeneral
BrandGSi
ModelSweep II Series
CategoryFarm Equipment
LanguageEnglish

Related product manuals