5. Assembly
PNEG-750-G2 16" Series II Sweep 131' and 135' Diameter 49
Center Pivot Installation
A. Center pivot with pivot kit
1. Use the pivot assembly supplied with the sweep pivot kit and cut it to fit, if needed.
2. Feed the multi-conductor cord through the hole in the back of the sweep head section leaving
five feet (5') of cord outside the hole. (See Figure 5AI.)
Figure 5AI
The center pipe of the pivot assembly MUST be in the center of the bin. If it is
not, the sweep could hit the bin wall.