5. Assembly
PNEG-750-G2 16" Series II Sweep 131' and 135' Diameter 25
Flighting Assembly
A. Lay out the flight sections in order of assembly starting with the head flight working towards the
tail flight.
B. Using the connecting stubs, bolt the flight sections together with hex bolts and lock nuts. Make sure
the flight ends are in time with each other.
Figure 5C
C. Slide the end stub through the bearing plate on the tail section and into the tail flight securing it with
hex bolts and lock nuts.
Figure 5D