Complete these procedures to congure your library.
1. “The Initial setup process” on page 67
2. “Initial conguration and customization” on page 68
3. “Labeling and loading tape cartridges” on page 69
4. “Verifying the installation” on page 71
5. “Advanced library conguration” on page 71
6. “Verifying the host connection” on page 73
Unpacking the Base Module and Expansion Modules
Procedure for safely unpacking the Base and Expansion Modules.
About this task
Before any modules are unpacked, clear a work surface near the targeted rack or table for installation.
Attention: If the temperature in the room where the library operates varies by 15° C (30° F) from
where the module was stored, allow it to acclimate for at least 12 hours before it is unpacked.
Unpacking a Base Module or Expansion Module
Procedure
1. Before a module is opened or removed from the box, inspect the container for shipping damage.
2. If you notice any damage, report it to the shipping company immediately.
3. Remove the module from the box.
Important: Lift the module out of the box by the long sides, not by the display.
Figure 25. Removing the module from the box
IBM Condential
Chapter 3. Installing49