Inspection and Installation
1 Inspection and Installation
♦ Verifying the Shipment
♦ Instrument Size Introduction
♦ Connecting the Power Cord
♦ Connecting the Device Under Test (DUT)
1.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect with
the appearance of the items, contact the dealer from which you purchased the
instrument immediately.
The package contents include:
Item
Qty.
Model Remarks
power supply x1 IT6500C
series
This series include:
IT6512C/IT6513C/IT6514C/
IT6515C/IT6516C/IT6517C/
IT6522C/IT6523C/IT6524C/
IT6525C/IT6526C/IT6527C/
IT6532C/IT6533C/IT6534C/
IT6535C/IT6536C/IT6537C
Power cord x1 - Number of the power cords vary
depending on the model, See the
Section 1.3 Connecting the Power
Cord for power cord connection.
USB cable x1 - This accessory is selected when
the USB interface is used for
starting up remote operation.
Ex-factory Test
Report
x1 - It is the test report of the instrument
before delivery.
Upon verification of the shipment, keep the package and relevant contents
thereof in a safe place. When returning the instrument for warranty service or
repair, the specified packing requirements shall be met.
Copyright © Itech Electronic Co., Ltd.