Figure 19: Router Transport Kit Shipping Crate Door
7. Remove the router transport kit from the shipping container.
8. Remove the vapor corrosion inhibitor (VCI) packs attached to the pallet, being careful
not to break the VCI packs open.
9. Save the shipping crate cover, pallet, and packing materials in case you need to move
or ship the router transport kit at a later time.
Install the Router Transport Kit onto the Router
The router transport kit includes the following components:
•
Router transport platform
•
Router transport left and right mounting plates with adjustable wheel assembly
•
Router winch mount with winch strap plate
Copyright © 2015, Juniper Networks, Inc.30
MX2020 3D Universal Edge Router Quick Start