Drive in new ball races.
INSTALLATION
Apply grease to the top and bottom ball races
and install 26 steel balls on the top ball race
and 19 steel balls on the bottom ball race.
Then, install the front fork.
Apply grease to the top cone race and install
it.
Tighten the top cone race and then turn the
steering stem right and left several times to
make steel balls contact each other closely.
Install the steering stem lock nut and tighten
it while holding the top cone race.
Torque: 8.0_ 12.0kg-m
Install the front wheel. (
14-7)
Install the front brake caliper. (
14-12)
Install the front inner fender. (
2-6)
Install the throttle grip and the right and left
handlebar switches.(
14-5)
Install the right and left brake master
cylinders. (
14-5)