EasyManuals Logo
Home>Manitowoc>Construction Equipment>18000

Manitowoc 18000 User Manual

Manitowoc 18000
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #236 background imageLoading...
Page #236 background image
Reference Only
SET-UP AND INSTALLATION 18000 OPERATOR MANUAL
4-84
Published 12-05-17, Control # 032-23
5
Lugs C
View D
Lift
14
(working)
14
(stored)
15
(working)
15
(stored; not visible)
4-170
View B
6
P1221
7
1
View F
2
Blocking
OPERATING POSITION
SHIPPING POSITION
13
12
Lug B
2
View A
12
11
Lift with Lug on Ends
of Sheave Shaft
Lug A
4-166
View C
8
9
4-168
View E
10
(stored)
10
4-169
Item Description Item Description Item Description
1 20 ft (6,1 m) #55 Boom Butt 6 Chain Sling 11 Drum Bracket
2 10 ft (3,0 m) #55 Insert 7 Lifting Lugs (4 places each insert) 12 Pin with Cotter Pin
3 20 ft (6,1 m) #55 Insert 8 Fixed Pin with Safety Pin (typical) 13 Drum 1 Wire Rope Guide
4 40 ft (12,2 m) #55 Insert 9 Hooked Connector (typical) 14 Drum 6 Wire Rope Guide
5 40 ft (12,2 m) #55 Insert
with Drum 6 Sheaves
10 Connecting Pin with Safety Pin (typical) 15 Pin with Snap Pins
FIGURE 4-42
3, 4, or 5
See Boom Rigging Drawing
at End of this Section
4-167

Table of Contents

Other manuals for Manitowoc 18000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 18000 and is the answer not in the manual?

Manitowoc 18000 Specifications

General IconGeneral
BrandManitowoc
Model18000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals