Manitowoc Published 12-05-17, Control # 032-23 4-137
18000 OPERATOR MANUAL SET-UP AND INSTALLATION
LIVE MAST REEVING
General
The live mast wire rope must be reeved between Drum 5 and
the mast hoist sheaves as shown in Figure 4-81
.
Manitowoc provides a 7/8 in (22 mm) terminator socket and
wedge for anchoring the wire rope to the mast hoist sheave
cluster on the rotating bed.
Wire Rope Specification
See Wire Rope Specifications chart in Capacity Chart
Manual.
FIGURE 4-81
Sheave Cluster at Rear
of Rotating Bed
Drum 5
(Live Mast Hoist)
Sheave Cluster at
End of Live Mast
Dead-End
Link
Ter mi na to r
Wedge Socket
P2207
4-231