EasyManuals Logo
Home>MTS Systems>Test Equipment>Exceed 40 Series

MTS Systems Exceed 40 Series User Manual

Default Icon
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
MTS Exceed™ Series 40 Product Manual
44
Frame Location and Ventilation
Installation
Frame Location and Ventilation
To ensure proper ventilation, locate the load frame approximately 300 mm (12
inches) from adjacent walls and equipment. Allow approximately 1 m (3 feet)
behind the equipment for service access. Do not block the vent holes on the sides
or bottom of the frame.
For comfortable working conditions and proper equipment operation, heat
dissipation of the equipment must be considered in providing adequate heating or
air conditioning in the laboratory area. Heat dissipation can be approximated by
summing the heat losses going into a room (1 kVA is equivalent to 860 kcal/hr
[3,400 Btu/hr]) and the gains from other sources such as furnaces and personnel.
0Exceed product manual.book Page 44 Wednesday, August 27, 2014 2:55 PM

Table of Contents

Other manuals for MTS Systems Exceed 40 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTS Systems Exceed 40 Series and is the answer not in the manual?

MTS Systems Exceed 40 Series Specifications

General IconGeneral
BrandMTS Systems
ModelExceed 40 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals