3FE-49441-ABAA-TCZZA
Issue 1
Procedure
6.7 Procedure
Use this procedure to install a G-2426G-B indoor ONT.
1
Place the indoor ONT unit on a flat surface, such as a desk or shelf.
Note: The G-2426G-B cannot be stacked with another ONT or with other equipment. The
ONT mounting requirements are:
• allow a minimum 100 mm clearance above the top cover
• allow a minimum 50 mm clearance from the side vents
• do not place any heat source directly above the top cover or below the bottom cover
2
Review the connection locations, as shown in Figure 6-1, “G-2426G-B ONT connections”
(p. 70).
Figure 6-1 G-2426G-B ONT connections
Wi-Fi security/
on/off buttons
USB
Ethernet
ports (4)
(RJ-45)
POTS
ports (2)
(RJ-11)
On/off
button
Power
36737