EasyManuals Logo
Home>Omron>Touch terminals>NS5-SQ00 V2 Series

Omron NS5-SQ00 V2 Series User Manual

Omron NS5-SQ00 V2 Series
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
3-8 Installing the Controller Link Interface Unit
Note The minimum length of the communications cable between nodes is 1 m. Prepare the com-
munications cables at a length of 1 m or longer.
Use the multidrop method for connecting nodes. Normal communications will not be possi-
ble with T branches.
Ground all of the shield lines (including the shield line for the node at only one end of the net-
work) in the way shown below.
Board in the middle
of the network
Board at the end of
the network
Terminating
resistance: ON
Terminating
resistance: OFF
Terminating
resistance: ON
Board at the end of
the network
Ground
Reference Terminals of the same type are connected internally. They can thus be connected to
either the right or left half of the end Boards.
End Board
Connecting Cables to Communications Connectors
When connecting a communications cable to a Controller Link Support Board, connect the
cable to the attached connector first and then attach to the connector to the Board.
Connect the communications cable to the connector using the following procedure.
1. Taking care not to damage the mesh of the shield, strip about 50 mm off the end of the
cable. Do not strip the cable too far because it may cause a short-circuit.
Approx. 50 mm
3-51

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron NS5-SQ00 V2 Series and is the answer not in the manual?

Omron NS5-SQ00 V2 Series Specifications

General IconGeneral
BrandOmron
ModelNS5-SQ00 V2 Series
CategoryTouch terminals
LanguageEnglish

Related product manuals