12 | MOVE ZR Installation & Owner’s Guide
DRILL PILOT HOLES
STEP 1 After reading CHOOSING A MOUNTING
LOCATION and determining a mounting
location based on those parameters, use the
supplied drill template to mark mounting holes.
It is required that you use all six Bolts
2
and
spread them out as far as possible.
STEP 2 Drill pilot holes using a 5/16” Drill Bit.
Mounting Holes
Preferred Mounting Holes
MOUNTING THE MOVE ZR
INSTALL HARDWARE
Line up the trolling motor base with the mounting holes. Have
someone hold the trolling motor in place while you install the
mounting hardware in order using a 7/16” Socket & Wrench.
Tighten hardware snug.
1. (6) Bolts
2
2. (6) 1/4” Flat Washers
3
3. (6) Rubber Washers
4
(If needed)
4. Boat Deck
5. (6) Large Washers
5
6. (6) Nylon Lock Nuts
6
Boat Deck
IMPORTANT! If installing to gel-coat, follow the drilling procedure in Appendix A (p. 41) to ensure you do not crack
or chip the gel-coat.
Always disconnect power by turning the main battery cutoff switch to the off position before performing any installations.
Check the area beneath where the MOVE will be installed to ensure there are no hoses, wires, lines, tanks or
other sensitive components.
If installing to a boat deck that is not flat or has a bow/curve, washers
4
must be used.
2
2
2
3
3
3
6
6
6
5
5
5
44
4