MOVE ZR Installation & Owner’s Guide | 25
36v WIRING
Connector Cable Connector Cable
Negative Lead from
Move
Battery 1 High Side Battery 3 Low SideBattery 2
Wiring with Three 12v Batteries Connected in Series
STEP 1 Read ALL safety warnings and precautions on p. 23 before installing the Move.
STEP 2 Install a connector cable to the negative (-) post of Battery 1 (high side) and positive (+) post of Battery 2. Install
another connector cable to the negative (-) post of Battery 2 and positive (+) post of Battery 3 (low side).
STEP 3 Connect the positive (+) lead from the Move to the positive (+) post of Battery 1 (high side).
STEP 4 Connect the negative (-) lead from the Move to the negative (-) post of Battery 3 (low side).
Wiring with a single 36v Lithium Battery
STEP 1 Read ALL safety warnings and precautions on p. 23 before installing the Move.
STEP 2 Connect the positive (+) lead from the Move to the positive (+) post.
NOTE: The Move may also be wired to multiple 36v batteries wired in parallel.
STEP 3 Connect the negative (-) lead from the Move to the negative (-) post.
Before proceeding, allow battery compartment to vent for at least 15 minutes. This allows any
combustible gases that have built up in the compartment to escape.
Positive Lead from
Move
To 60 Amp Circuit
Breaker
Positive Lead from
Move
To 60 Amp Circuit
Breaker
Negative Lead from
Move
The positive lead on a 36v setup MUST be wired through a 60 Amp Circuit Breaker.
The positive lead on a 36v setup MUST be wired through a 60 Amp Circuit Breaker.