BASCJ_EN
V03 | 07.2015
15
www.schaerer.comInstallation and commissioning
Deinstallation and disposal
The coffee machine must be disposed of correctly in conformity with local and legal regula-
tions.
► Contact your service partner.
Water filter: No To set the use of a water filter:
► Set the use with and .
► Confirm by touching .
Option 1: Input "no"
The next commissioning step appears.
Option 2: If "yes" is set, the filter rinse is ex-
ecuted automatically.
► Place a container with a capacity of ca. 3 l
under the hot water outlet.
► Fill the drinking water container completely.
After the filter rinse cycle is completed,
the next step is displayed.
Yes/No If "Yes" is set, a filter rin-
se is then executed au-
tomatically.
The machine heats up The coffee machine begins heating up.
After heating, the coffee system is rinsed.
► Place a container under the beverage outlet.
The rinse cycle takes ca. 40 sec.
– The coffee system rinse
cleans and warms up all
pipes.
"Espresso" beverage button
A test brewing is performed at the end of the
commissioning program.
The button flashes.
► Place a suitable container below the bever-
age outlet.
► Press the button.
The test brewing starts.
► Pour away the test beverage; do not drink it.
––
Your selection please The coffee machine is now ready to use. – All settings that were
made now can be chan-
ged later.
See "Programming".
Display/ display text Parameter description Setting range Notes