BASCJ_EN
V03 | 07.2015
17
www.schaerer.comOperation
► Reinsert the drinking water tank.
Milk
Option 1: Milk Smart
► Have fresh, pre-cooled milk (3 – 5°C) ready.
► Hang the hose or hoses into the milk.
The hose end must be in contact with the container floor.
Option 2: Side cooling unit
► Open the door.
► Remove and rinse the milk container.
► Pour in fresh, pre-cooled milk (3 – 5°C).
► Place the milk container into the cooling unit.
► Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
► Close the door.
Switching on
► Press the button.
The coffee machine switches on and the greeting message appears on the display.
► Place a container under the beverage outlet.
The coffee machine begins heating up.
After heating up, the coffee machine performs a coffee system rinse (duration:
ca. 40 sec).
Option 1: Mains water unit
► Connect the mains water unit to the power supply.
Option 2: Side cooling unit
► Connect the side cooling unit to the mains power supply and switch on by means of the
main switch.
No more than 40 cm should be between the milk package and the beverage outlet.
See also "Safety notes" - "Hygiene" - "Milk".
Note the voltage specifications on the serial plate of the mains water supply.
Take heed of the operating instructions of the side cooling unit.
See “Operator control” - “Filling and connecting” - “Milk” - “Option: Additional cooling unit”.