3 Unpacking and Storage User Manual
3.2 Scope of Delivery
图
1: Scope of Delivery
a. The mounting-bracket includes 2 mounting-bracket components and 1 connecting bar.
b. The screws include two M4×10, two M6×65, and two M6×14 hex socket screws.
c. The two OT terminals are used for wiring power cable of the tracking system, where the
wiring range is 4–6mm
2
.
d. The documents include the quick installation guide, packing list, warranty card, etc.
3.3 Inverter Storage
Proper storage is required if the inverter is not installed immediately.
16