29
Step 3 Hoist the inverter, and stop to check for safety when the inverter is 100mm above the ground.
Continue hoisting the device to the destination after ensuring the safety.
Step 4 Remove the lifting rings and reassemble the sealing screws released in Step 1.
Keep the inverter balanced throughout the hoisting process and avoid collisions
with walls or other objects.
Stop hoisting in the event of severe weather, such as heavy rain, thick fog, or
strong wind.
The lifting rings and the sling are not within the delivery scope.
- - End
4.5 Installing Mounting-bracket
Inverter is installed on the wall and bracket by means of mounting bracket.
User Manual 4 Mechanical Mounting