3-6 ENGINE
ENGINE REINSTALLATION
Reinstall the engine in the reverse order of engine removal.
Install the engine mounting bolts and nuts as shown in the following illustration.
Tighten the engine mounting nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of any
use.
Tighten the swingarm pivot nut to the specified torque.
" Swingarm pivot nut: 65 N·m (6.5 kgf-m, 47.0 lb-ft)
Tighten the engine mounting bracket nuts to the specified
torque.
" Engine mounting bracket nut:
40 N·m (4.0 kgf-m, 29.0 lb-ft)
ITEM N·m kgf
.
m lb-ft
A
40 4.0 29.0
B
40 4.0 29.0
C
40 4.0 29.0
@

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki DR 125 and is the answer not in the manual?

Suzuki DR 125 Specifications

General IconGeneral
BrandSuzuki
ModelDR 125
CategoryMotorcycle
LanguageEnglish

Related product manuals