Less than 1 month 1–6 months Greater than 6 months
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
Notify the local Trane office if charge has
escaped
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
Notify the local Trane office if charge has
escaped
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads 3 to 5 psig
(20.7 to 34.5 kPaG)
Notify the local Trane office if charge has
escaped
Do not operate purge unit Do not operate purge unit Do not operate purge unit
Verify waterbox and tube bundles are
clean and dry
Verify waterbox and tube bundles are clean and
dry
Conduct an oil analysis and verify no oil
breakdown
(a)
Repeat yearly
Replace oil if breakdown has occurred
If no oil analysis program has been followed,
replace oil prior to start-up
Every six months, check unit pressure or
vacuum and take note of changes that could
indicate a leak; contact your local Trane office if
any leaks occur
Every six months, start the oil pump and rotate
compressor shaft about 450° to prevent
potential bearing issues
(a)
; contact your local
Trane Service Agency to perform this task
If the chiller will be stored for more than
six months after production, contact your local
Trane Service Agency for required extended
storage actions to minimize impact to the chiller
and preserve the warranty.
Chillers stored five years or longer should be
inspected for leaks every five years by a
qualified service organization
(a)
If the chiller will be stored for more than six months after production, contact your local Trane Service Agency for required extended storage actions to
minimize impact to the chiller and preserve the warranty.
PPrree--IInnssttaallllaattiioonn

Table of Contents

Other manuals for Trane CVHG

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane CVHG and is the answer not in the manual?

Trane CVHG Specifications

General IconGeneral
BrandTrane
ModelCVHG
CategoryChiller
LanguageEnglish

Related product manuals