EasyManuals Logo
Home>Volkswagen>Automobile>CC 2012

Volkswagen CC 2012 User Manual

Volkswagen CC 2012
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
Pull out locking pin - T10027- from tensioning roller.
Always start engine and check belt running after completing work.
Install
front right wheel housing liner General body repairs,
exterior; Rep. gr. 66 ; Wheel housing liner; Removing and
installing front wheel housing liner .
Install noise insulation General body repairs, exterior; Rep.
gr. 66 ; Noise insulation; Assembly overview – noise insula‐
tion .
1.4 Removing and installing tensioner for
poly V-belt
Remove poly V-belt ⇒ page 31 .
Unscrew bolt -2- and remove tensioning element -1-.
Install
in reverse order. During this step, observe the following:
Bolted connection
Torque setting
Tensioning element on bracket for ancillaries 50 Nm
1.5 Removing
and installing vibration damp‐
er
Special tools and workshop equipment required
Counter-hold tool - T10172-
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
32 Rep. gr.13 - Crankshaft group

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Volkswagen CC 2012 and is the answer not in the manual?

Volkswagen CC 2012 Specifications

General IconGeneral
BrandVolkswagen
ModelCC 2012
CategoryAutomobile
LanguageEnglish

Related product manuals