SVS-200 Installation, Operation and Maintenance
IMPORTANT INFORMATION – SAVE THESE INSTRUCTIONS
20153-W-03-01 1 Webasto Charging Systems, Inc.
1 Getting Started
Before you begin, take the time to familiarize yourself with the Cautions in Section 2, and read the
installation instructions in Section 4 completely before you install your new SVS-300.
To get your system up and running quickly perform the following steps:
1. Ensure the SVS-300 siting requirements are followed. (Sections 4.5)
2. Connect the 3 phase utility power to the SVS-300, and apply power to the SVS-300. (Sections
4.6)
3. Install the BMID onto the battery pack. (Sections 3)
4. Once the BMID is installed, connect the charger to the battery pack.
5. If your BMID does not come pre-configured, you will need to initialize the new BMID. (Refer to
BMID programming, document #06701)
6. Once the BMID has been properly programmed, the battery pack is ready to begin charging.