2.3 On-site installation
2.3.1 Lifting robot with lifting slings
Required equipment
NoteEquipment
Length: 2 m. Load at 90°: 380 kg.Sling line Type: KDBK 7-8.
Illustration, attachment of lifting slings
The figure below shows how to attach the lifting slings to the robot.
xx0200000164
Lifting of robot
NoteAction
If necessary, release the brakes as
detailed in section Manually releas-
ing the brakes on page 59.
Move the robot to the lifting position shown in
the figure above.
1
Attach the straps to the special eye bolts on the
gearboxes for axes 2 and 3.
2
Lift the robot carefully.3
58 Product manual - IRB 2400
3HAC022031-001 Revision: P
© Copyright 2004-2018 ABB. All rights reserved.
2 Installation and commissioning
2.3.1 Lifting robot with lifting slings

Table of Contents

Other manuals for ABB IRB 2400/L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRB 2400/L and is the answer not in the manual?

ABB IRB 2400/L Specifications

General IconGeneral
BrandABB
ModelIRB 2400/L
CategoryRobotics
LanguageEnglish

Related product manuals