7 Electrical installation
7.1 General electrical installation procedure
Preliminary requirements
•
Procedure
1. Remove the maintenance cover. Refer to section
9.3
.
2. Install the AC input cable.
• Insert the AC input cable. Refer to section
7.2
.
• Connect the AC input cable. Refer to section
7.3
.
3. Install the Ethernet cable.
• Insert the Ethernet cable. Refer to section
7.4.1
.
• Connect the Ethernet cable. Refer to section
7.4.2
.
4. If necessary, install the cables for smart meter communication.
• Insert the cables for smart meter communication. Refer to section
7.4.3
.
• Connect the cables for smart meter communication. Refer to section
7.4.4
.
5. If you want to use the internet, insert the Nano-SIM card. Refer to section
7.4.5
.
6. If necessary, replace the EV charge cable. Refer to section
7.5
.
7. Install the maintenance cover. Refer to section
9.4
.
7.2 Insert the AC input cable
Preliminary requirements
• Screw driver • AC input cable
Procedure
1. Remove the membrane (A) from the
EVSE.
2. Make a hole in the center of the
membrane.
3. Install the membrane.
4. Strip the wires. For the specification,
refer to section
11.13
.
5. Push the wires through the membrane.
6. Put the AC input cable (B) through the
inlet hole.
Electrical installation
BCM.V3Y01.0-EN | 001 31