7.3.3 Connect the AC input cable (3 phase)
Preliminary requirements
• Torque screw driver • AC input cable (3 phase, TN-
TT networks)
Procedure
1. Loosen the screws (A).
2. Insert the cable connector into the
terminal block (B).
3. Connect these wires:
1. Earthing wire (C)
2. Neutral wire (D)
3. L1 (E)
4. L2 (F)
5. L3 (G)
Refer to section
11.11
.
4. Tighten the screws (A) to the correct
torque. For the specification, refer to
section
11.16
.
7.3.4 Secure the cables
Preliminary requirements
• Torque screw driver • Strain relief for the cable
Procedure
1. Secure the cables (A) with the strain
relief (B).
2. Install the two screws (C) of the strain
relief.
Electrical installation
BCM.V3Y01.0-EN | 001 33