Procedure
1. Insert the Nano-SIM card (A) into the
socket (B). Make sure that the position of
the connection points is correct.
7.5 Replace the EV charge cable
Preliminary requirements
1. The standard supplied EV
charge cable on the EVSE
does not agree with the
specifications.
• EV charge cable within the
specifications. Refer to
section
11.13
.
• Torque screw driver
Procedure
1. Get access to the EV charge cable
connection:
a. Remove the cabinet cover. Refer to
section
9.1
.
b. Remove the maintenance cover.
Refer to section
9.3
.
c. Remove the plastic cover.
2. Disconnect the EV charger 2-pin
connector (A) that is receptable to the
CP/PP connector.
3. Loosen the screw (B) on the terminal
block output connector (C).
4. Disconnect the wires:
• L1(D)
• L2 (E)
• L3 (F)
• Earthing wire (G)
• Neutral wire (H)
5. Remove the EV charge cable.
Electrical installation
36 BCM.V3Y01.0-EN | 001