7.3 Connect the AC input cable
7.3.1 Connect the AC input cable (1 phase)
Preliminary requirements
• Torque screw driver • AC input cable (1 phase)
Procedure
1. Loosen the screws (A).
2. Strip the wires. For the specification,
refer to section
11.13.1
.
3. Insert the cable connector into the
terminal block (B).
4. Connect the below wires:
1. Earthing wire (C)
2. Neutral wire (D)
3. AC input wire (E)
Refer to section
11.11
.
5. Tighten the screws (A) to the correct
torque. For the specification, refer to
section
11.16
.
7.3.2 Connect the AC input cable (split phase)(North America)
Preliminary requirements
• Torque screw driver • AC input cable (1 phase)
Procedure
1. Loosen the screws (A).
2. Strip the wires. For the specification,
refer to section
11.13.2
.
3. Insert the cable connector into the
terminal block (B).
4. Connect the below wires:
1. Earthing wire (C)
2. L2 wire for split phase (D)
3. L1 wire for split phase (E)
Refer to section
11.11
.
5. Tighten the screws (A) to the correct
torque. For the specification, refer to
section
11.16
.
Electrical installation
32 BCM.V3Y01.0-EN | 001