Example of annual programming:
Annual programming between 15th October and 1st April, the frost protection state will be active.
3.18 - Access level
The PLC comprises 3 access levels, which are used to prevent unauthorised persons from altering certain parameters.
Level 1 is the "customer" level. It is used to alter the setpoints.
Level 2 is the "installer" level. It is used to alter the settings parameters.
Level 3 is the "manufacturer" level. It is used to alter the machine parameters.
3 - FEATURES
FLOWAY ACCESS EN-26