Quick Panel Operator User Manual Section 5
GFK-2847AA Jan 2023
Mounting and Installation 53
Section 5: Mounting and Installation
This Section provides the following procedures to mount and install the
QuickPanel
+
Operator Interface:
•
Protective Sheet Installation
•
Mounting Location
•
Panel Mounting
•
VESA Arm Mounting
•
Battery Installation and Replacement
•
Connectors
5.1 Protective Sheet Installation
To install the protective sheet
1.
Remove the protective film from the QuickPanel
+
display screen.
2.
Wipe the display unit for any dust or fingerprints.
3.
Peel back a corner of the clear side of the protective sheet.
4.
Begin applying the corner to the display screen.
5.
Slowly apply the rest of the protective sheet, smoothing it out as
you go.
6.
Peel the green curing film from the protective sheet.