Site Preparations
2-14 Vivid T9/Vivid T8 – Basic Service Manual
5795591-100 English Rev. 3
2-3-3 Required facility needs
NOTE: GE Healthcare requires a dedicated power and ground for the
proper operation of its Ultrasound equipment. This dedicated
power shall originate at the last distribution panel before the
Ultrasound system.
Sites with a mains power system with defined Neutral and Live
:
The dedicated line shall consist of one phase, a neutral (not
shared with any other circuit), and a full size ground wire from
the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral
:
The dedicated line shall consist of one phase (two lines), not
shared with any other circuit, and a full size ground wire from the
distribution panel to the Ultrasound outlet.