2G40, 2G40 H Operation and use
HATZ
33Operator’s Manual
Max. permissible forces at the speed control and stop levers
7.2 Performing tests
Before starting
Before starting the engine, several tests need to be performed to ensure the
machine is working properly.
Procedure
Step Test
1 The machine is standing securely and on a level surface.
2 The installation location is adequately ventilated.
3 There is a sufficient amount of fuel in the fuel tank (see chapter
7.7 Refueling, page 46).
4 There is a sufficient amount of engine oil in the engine housing
(see chapter 6.4 Filling engine oil (first filling), page 29).
5 Fill the oil bath air filter (option) with engine oil (see chapter 6.5
Filling the oil bath air filter (option), page 31).
6 No persons are located in the danger zone of the engine or ma-
chine.
7 All safety equipment is in place.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hatz 2G40 and is the answer not in the manual?

Hatz 2G40 Specifications

General IconGeneral
Displacement462 cm³
Cooling SystemAir-cooled
Compression Ratio20.5:1
Fuel TypeDiesel
Fuel SystemDirect injection
Starting SystemElectric starter
Engine Type1-cylinder 4-stroke diesel engine
Lubrication SystemForced lubrication

Related product manuals