EasyManuals Logo

Komatsu PC308USLC-3E0 User Manual

Komatsu PC308USLC-3E0
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #255 background imageLoading...
Page #255 background image
.
MAINTENANCE
MAINTENANCE PROCEDURE
EVERY 100 HOURS MAINTENANCE
LUBRICATING
NOTICE
If any abnormal noise is generated from any greasing point, carry out greasing regardless of the greasing interval.
Carry out greasing every 10 hours for the first 50 hours on a new machine.
After the machine was subjected to jobs in the water, be sure to grease the wet pins.
1.
Set the machine to the greasing posture shown on the right,
lower the work equipment to the ground, then stop the engine.
2.
Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3. After greasing, wipe off any old grease that was pushed out.
(1) Arm-Link coupling pin (1 place)
(2) Arm - Bucket connection pin (1 place)
(3) Link coupling pin (2 places)
(4) Bucket cylinder rod pin (1 place)
(5) Bucket-Link coupling pin (1 place)
4 - 41

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC308USLC-3E0 and is the answer not in the manual?

Komatsu PC308USLC-3E0 Specifications

General IconGeneral
BrandKomatsu
ModelPC308USLC-3E0
CategoryExcavators
LanguageEnglish

Related product manuals