Crane operation
11.1 Before operating the crane
11 - 2 3 302 709 en Operating manual
GMK5150L
12.01.2018
3. – Switch on the cameras for crane operation; à p. 12 - 150.
– Adjust the slewable spotlights if necessary;
à p. 11 - 130.
4. Crane cab heater – check the fuel level;
à p. 11 - 5.
5. Earth the load, if necessary;
à p. 11 - 13.
6. Adjust crane cab seat and front panel;
à Crane cab seat, p. 11 - 8,
à Front control panel, p. 11 - 9.
7. Start the engine for crane operation;
à p. 10 - 7.
8. Check
– RCL,
– lifting limit switch,
– seat contact switch and dead man's switch,
– emergency stop switch,
for correct operation. Have faulty units repaired;
à p. 11 - 10.