Rigging work
12.8 Outrigger operation
12 - 44 3 302 709 en Operating manual
GMK5150L
12.01.2018
6. Switch off the engine;
– After operating it from the control units;
à p. 4 - 18.
– After operating it from the crane cab or using the hand-held control;
à p. 10 - 11.
12.8.3 Preparing the truck crane
Driver's cab Leveling the truck crane
• Level the truck crane with the level adjustment system; à Operating the
level adjustment system
, p. 5 - 53.
Locking the suspension
• Switch off the suspension; à Switching the suspension on/off, p. 5 - 16.
The control elements for the outriggers are only released if the suspension
is switched off. If the suspension is switched off, the wheels are lifted when
the crane is put on outriggers.
Crane cab The outriggers can be moved from the crane only when:
– The suspension is switched off.
– The parking brake is applied.
– The slewing gear is switched off.
• Open the Outrigger menu (1) if necessary.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK5150L and is the answer not in the manual?

Manitowoc GROVE GMK5150L Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK5150L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals