Rigging work
12.8 Outrigger operation
12 - 42 3 302 709 en Operating manual
GMK5150L
12.01.2018
5. Move the outrigger pads into the operating position and secure them;
à p. 12 - 53.
6. Enlarge the load-bearing area if necessary;
à Determining the required load-bearing area, p. 12 - 11,
à Enlarging the load-bearing area, p. 12 - 55.
7. Extend the supporting cylinders until none of the wheels are touching
the ground;
à p. 12 - 56.
8. Level the truck crane horizontally with the outriggers.
The lamp (1) lights up in the measuring range 1°;
à p. 12 - 60.
9. Check that none of the wheels are touching the ground.
Raise the wheels if necessary;
à Operating the axle raising system,
p. 12 - 66.
10. Switch off the engine:
– After operating it from the control units;
à p. 12 - 29.
– After operating it from the crane cab;
à p. 10 - 11.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK5150L and is the answer not in the manual?

Manitowoc GROVE GMK5150L Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK5150L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals