Rigging work
12.10 Rigging work on the main boom
Operating manual 3 302 709 en 12 - 131
GMK5150L
12.01.2018
Unreeving
hoist rope
• Pull out the rods (5) and (3).
• Fold down the plates (1).
• Remove the rope end fitting from the fixed
point (2) or (4).
• Unreeve the hoist rope.
• Insert the rods (5) and (3) and secure them.
Depending on the driving mode, you can:
– Fasten the hoist rope to the bumper;
à p. 12 - 119 or
– Pull out the rods (1), (2) and roll the hoist
rope (3) on to the drum.
• Insert the rods (1), (2) and secure them.
• Secure the hoist rope (3).