EasyManuals Logo
Home>PIAGGIO>Scooter>X7 250ie

PIAGGIO X7 250ie User Manual

PIAGGIO X7 250ie
320 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #169 background imageLoading...
Page #169 background image
control unit disconnected and the injection load re-
mote control disconnected, that the Black-Purple
cable (pin 20 on the interface wiring) is insulated
from the ground.
Specific tooling
020331Y Digital multimeter
Circuit leak test
Install the appropriate tool for fuel pressure control
with the pipe fitted with the pressure gauge on the
delivery pipe..
Check during regular operation by placing the ap-
propriate tool between the pump and the injector.
With the battery voltage> 12 V check that the fuel
pressure is 2.5 BAR and that the input current is
1.4 to 1.8 A
With the battery voltage > 12 V, check the pump flow rate by disconnecting from the injector the pipe
equipped with the pressure gauge of the appropriate tool. Make a graded burette available with a flow
rate of approximately 1 L. Rotate the pump using the active diagnosis of the palm top computer. Using
X7 250ie Injection
INJEC - 19

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PIAGGIO X7 250ie and is the answer not in the manual?

PIAGGIO X7 250ie Specifications

General IconGeneral
BrandPIAGGIO
ModelX7 250ie
CategoryScooter
LanguageEnglish

Related product manuals