BRIDGE UNIT INSTALLATION (B397)
SM 1-9 G065
Installation
8. If an optional finisher is to be installed, attach two mylars [A] to the bridge unit.
9. Remove the cover [B].
10. Install the bridge unit [C] (! x 2).
11. Connect the bridge unit I/F harnesses [D] (" x 2).
12. Install the connector cover [E].
13. Turn on the main switch and check the bridge unit operation (make sure that
there are no paper jams).
B397I402.WMF
B397I444.WMF
[A]
[B]
[C]
[E]
[D]