1000-SHEET FINISHER INSTALLATION (A681)
SM 1-11 G065
Installation
1.1.2 INSTALLATION PROCEDURE
!
CAUTION
Switch off the main machine and unplug its power cord before starting the
following procedure.
NOTE: The bridge unit (B397) and paper tray unit (G520) must be installed before
installing this finisher.
If the mailbox (G909) will be installed, first install the mailbox, then the
bridge unit for the mailbox (G912), and finally install the finisher.
1. Unpack the finisher and remove the tapes and retainers.
A681I701.WMF
A681I702.WMF