Chapter 4: Auto-transformer and Backed-up
Loads Panel Installation (for Backup)
Theauto-transformerisusedforbackuppoweronly,andisnotmandatoryifusingSmartEnergy
Managementapplicationsonly.Refertothetableonpage10.
Theauto-transformerconnectstotheACsideoftheinverter.SincetheinverterACconnectionsareon
itsrightside,itisrecommendedtopositiontheauto-transformertotherightoftheinvertertosimplify
wiring.
SolarEdge StorEdge Installation Guide MAN-01-000262-1.2
28
Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)