EasyManuals Logo
Home>Vision>3D Glasses>REVO

Vision REVO User Manual

Vision REVO
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth Power Your Vision
15
3.3.8 Maintenance and repairing
After disconnecting the energy storage battery cabinet and UPS, confirm the
disconnection again before opening the front door for maintenance or overhaul.
In the maintenance and overhaul, the following items should be concerned:
Each operation must be carried out by expert users or by skilled users under
the supervision of expert users.
Ensure that the energy storage battery cabinet is not accidentally recharged.
Ensure no electricity in the energy storage battery cabinet with a Multimeter.
Insulate the possible electric part of REVO with insulation materials. Insulate
the positive and negative terminal of the battery module with insulating tape.
Ensure necessary ground connection.
3.3.9 Safety notice
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Read all instructions in the manual before installing or working on this product.
Failure to follow these instructions will result in death or serious injury.

Table of Contents

Other manuals for Vision REVO

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vision REVO and is the answer not in the manual?

Vision REVO Specifications

General IconGeneral
BrandVision
ModelREVO
Category3D Glasses
LanguageEnglish