SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth Power Your Vision
When the lithium battery system works, it is controlled by BMS
intelligently without the need for manual interference or control.
When the lithium battery cabinet is working, the cabinet door
should be locked tightly and the key of the door should be pulled
out.
According to different on-site installation conditions, please refer to the following
flowcharts to start up.
Figure 11.1-1 cold start without junction box
Step 1: Start installing batteries, ensure the battery power cables are correctly connected
and the communications cables have an anti-freeze mechanism. Connect the cables
according to COM1/COM2.
Step 2: Before starting the system, set the DIP codes of CBMS and GBMS. Dip rules have
been put in the manual.
Step 3: Double check the connection of cabinets is corrected