EasyManuals Logo
Home>Baxi>Boiler>POWER HT+ Series

Baxi POWER HT+ Series User Manual

Baxi POWER HT+ Series
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #131 background imageLoading...
Page #131 background image
13 Decommissioning
13.1 Decommissioning procedure
Caution
Only qualified professionals are authorised to carry out
maintenance work on the boiler and the heating system.
To switch off the boiler temporarily or permanently, proceed as follows:
1. Switch the boiler off.
2. Cut the electrical power to the boiler.
3. Close the gas valve on the boiler.
4. Drain the central heating system or ensure frost protection.
5. Close the door of the boiler to prevent air circulating inside it.
6. Remove the pipe connecting the boiler to the chimney and close the
nozzle with a plug.
13.2
Recommissioning procedure
Caution
Only qualified professionals are authorised to carry out
maintenance work on the boiler and the heating system.
Should it prove necessary to carry out the recommissioning of the boiler,
proceed as follows:
1. Re-establish electrical power to the boiler.
2. Remove the siphon.
3. Fill the siphon with water.
The siphon must be completely full.
4. Put the siphon back in place.
5. Fill the central heating system.
6. Open the boiler gas valve.
7. Start up the boiler.
13 Decommissioning
7702630 - v02 - 11082018 POWER HT + 131

Table of Contents

Other manuals for Baxi POWER HT+ Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baxi POWER HT+ Series and is the answer not in the manual?

Baxi POWER HT+ Series Specifications

General IconGeneral
BrandBaxi
ModelPOWER HT+ Series
CategoryBoiler
LanguageEnglish

Related product manuals